← Feed Deep Dive Matrix Subscribe

AI server demand tightens power device supply as lead times stretch to 270 days

digitimes.com 2026-07-07
Industry Analysis
Soaring AI server demand is pushing power semiconductors to their capacity limits. While Taiwan, China-based firms like Cystech temporarily benefit from MOSFET lead times stretching to 270 days, the technical ripple effect is forcing upstream 8-inch fabs and downstream liquid-cooling designs to adaptโ€”higher power density demands advanced packaging like clip-bonding and copper-clip technologies. Tightening U.S.-EU export controls on critical fab equipment raise compliance costs and limit domestic foundry expansion, exposing smaller IDMs to greater supply chain fragility. Competitively, Infineon and onsemi are fast-tracking GaN-on-SiC solutions to bypass silicon bottlenecks, while Taiwanese peers double down on BCD process integration. Within 18 months, the shortage will shift from delayed shipments to a systemic energy-efficiency ceiling, compelling server OEMs to redesign power architectures and accelerating third-gen semiconductor adoption in 48V AI server rails beyond 30% penetration.
Read Original Article →
This page displays AI-generated summaries and metadata for research purposes. Original content belongs to the respective publishers.